Westlake to Close Cologne PVC Plant in 2027: Exit List
Westlake will close its 165,000 t/y Cologne PVC site in Q1 2027. The wider exit list, and five questions for a supplier in writing before the site changes.
Westlake said on 29 September 2026 that it will close its PVC plant in Cologne, Germany, with production stopping in the first quarter of 2027. The site makes about 165,000 metric tons a year, and winding it down will cost the group roughly USD 205 million before tax. For buyers the tonnage matters less than what happens to the certificate when a grade moves from one site to another.
None of the closures announced so far removes a grade that an importer is currently approved on, and none of them has tightened the European market. What a closure changes is the site named on the certificate of analysis, and a change of site can require new approvals. The five points in section 5 settle most of the consequence in writing.
1. What was announced on 29 September
| Item | Detail as stated by Westlake |
|---|---|
| Site | PVC plant in Cologne, Germany, in the Cologne-Merkenich chemical park, operated by Westlake Vinnolit |
| Capacity | about 165,000 metric tons of PVC per year |
| Stop date | first quarter of 2027 |
| Cost | about USD 205 million pre-tax, roughly USD 100 million cash and USD 105 million non-cash |
| Accounting split | about USD 110 million booked in 2026, the balance in 2027 |
| Stated reasons | weak demand, elevated energy costs, increased import pressure from Asia, plus smaller scale and a higher logistics burden than the group's other European PVC sites |
| Supply after closure | customers keep being served from other German sites, including Wilhelmshaven |
The same release gave a market read. North American PVC and polyethylene average prices in the third quarter of 2026 came in below the second quarter, freight costs in the housing and infrastructure segment rose on higher diesel prices, and third-quarter financial performance is expected to be sequentially lower.
Taken line by line, this is a producer reallocating production inside a low-price environment. The closure covers one site, and the group says customers lose no supply.
2. The exit list runs wider than one site
| Announced or effective | Site | Operator | Reported capacity or scope |
|---|---|---|---|
| 2026-06-15 | Wilhelmshaven, Germany | Westlake Vinnolit, acquired from Vynova | 380,000 t/y PVC plus VCM, added, with a deep-water dock on the North Sea coast |
| 2026-09-29 | Cologne, Germany | Westlake Vinnolit | about 165,000 t/y PVC, stops in Q1 2027 |
| 2025-11 | Beek, Netherlands | Vynova | 225,000 t/y PVC, production ended |
| 2025-07 | Böhlen and Schkopau, Germany | Dow | ethylene cracker plus chlor-alkali and vinyl assets, approved for shutdown by Q4 2027, around 550 jobs |
| 2025-10 | Rheinberg, Germany | Ineos | two units including a chlorine plant, about 175 jobs |
| 2025-12 | Aberdeen, Mississippi and Lake Charles, Louisiana | Westlake | several chlorovinyl and styrene units, shut down |
Two things in that table matter more than the closure headline.
The first is that the additions offset part of the exits. Wilhelmshaven alone carries more than twice the annual capacity of the Cologne site, so a producer cutting one plant can be adding another in the same region within the same year. Net European capacity moves by far less than the closure announcements suggest.
The second is that the pattern repeats across ownership. Between October 2025 and September 2026, four different owners announced chlorovinyl or chlorine closures in Europe. Germany's chemical association, in a July 2026 report, put the first-half national chemical production decline at about 3% and trimmed its full-year forecast to a 1.5% drop, while also noting that investment is running roughly 15% below 2023 levels.
3. Why energy cost and location decide which site closes
Chlorine for vinyl chloride comes from brine electrolysis, and electrolysis is an electricity business. Ethylene comes from cracking hydrocarbons. A PVC producer sits between two energy markets, and a site with older cells and an inland freight profile cannot match a newer coastal site when power and logistics both move against it.
Westlake named both halves of that in the release. The Cologne site has higher costs than the group's other European PVC sites because of its smaller scale and heavier logistics burden. The Wilhelmshaven site, acquired from an insolvent owner and completed in June 2026, sits on the North Sea coast with its own deep-water dock for raw materials.
That is the actual pattern of these decisions: an older inland asset is retired after a newer coastal one is secured, and reading both announcements together shows a strategy that no single closure notice reveals.
4. What a closure does to the buyer's paperwork
A production site is part of the identity of a material, and buyers who have approved a grade tend to have that approval written against a site.
| What changes | Why it matters | What to do |
|---|---|---|
| Site name on the certificate of analysis | Traceability records name the producing site, not only the group | Keep a copy of the current certificate and note the site |
| Formulation consistency | A different site can run a different additive package within the same grade number | Ask for a written statement on the formulation |
| The buyer's own approvals | Drinking water, food contact and customer-specific approvals can be tied to site and process | Check whether the approval names a site |
| Freight distance | A coastal origin to an inland processor is a longer haul and a higher delivered cost | Ask for the delivered basis, not the ex-works basis |
| Lead time and continuity | A site stops on a stated quarter, and orders placed around it compete for remaining stock | Fix the last shipment date in writing |
| Specialty grades | Paste and other specialty PVC are the hardest to move between sites | An alternative should be qualified before it is needed |
Nothing in this list predicts a shortage. A supplier changing where a material is made leaves a paperwork consequence that reaches the buyer's desk.
5. Five points to settle with the supplier in writing
A written exchange with the supplier should settle five points. First, which production site made the grade being bought now and which site will make it after the change. Second, whether the grade number and the formulation both stay the same. Third, whether the buyer needs to re-approve the material on its side, and whether the supplier has test data to support that. Fourth, the last shipment date from the closing site and how much notice the buyer gets before supply moves. Fifth, how the freight difference is handled in the price if the new site is further from the buyer's plant.
The second point is the one that gets skipped, yet it is the one that costs time. A written confirmation from the supplier that both the grade number and the formulation stay the same does most of the work. Where the supplier cannot answer, that itself is the reason to qualify a second source before the change lands, not after.
6. What the announcements settle, and what stays open
The announcements themselves settle several points: the Cologne capacity of about 165,000 t/y, the stop date in Q1 2027, the USD 205 million pre-tax cost and its split across 2026 and 2027, the stated reasons, and the commitment to keep supplying from other German sites. Several matters stay open and fall outside company guidance — whether European prices tighten, whether material from closing sites redirects into other regions, which further plants follow, and the outcome of the European anti-dumping investigation opened on 23 September 2026. Ineos, which welcomed that investigation, has said PVC imports into the EU doubled over the twelve months to March 2026 and has asked for provisional measures to come faster.
The open items give no reason to change a contract this week, but they do make it worth knowing which site the material comes from.
Three public sources for the announcements:
- Westlake press release, 29 September 2026, closure of the Cologne PVC plant Which band each grade sits in is on the specification table; the document pack that travels with a change of production site is set out under packing and shipping.
- Westlake press release, completed acquisition of the Wilhelmshaven PVC and VCM site
- Polimerica News on the Cologne closure, the EU investigation and Ineos's position



The grades most exposed to a European site closure are the pipe and profile grades, SG-5 first: PVC Resin SG-5 (K 66-68).
SG-5 for the next production run
The grade, the tonnage and the destination port produce a price, a specification sheet and the full document list, usually within 12 hours (GMT+8).
